Join the Flecks and our crew as we attempt to repair and
upgrade a traditional 1970s ranch suburban standard home in one of the wettest
places in the Continental United States.
Changes
have been made to the inside of the house already. A pony wall was built entering the dining room, new doors were
hung, trim work has been on going, and there is enough new paint on the walls
to probably hold the entire house together if for some reason the nails were to
suddenly fail.
Anastasia and her grandfather, Gordon Fleck - Cheri and Anastasia with Laurel Fleck
Remove and replace the existing front door
with something that is already painted;
Finish the dining room – to include: (a) finishing the Paladin window that was a new
addition (new sheet rock, mud, tape, prime); (b) crown molding; (c) new
flooring – if it arrives in time; (d) baseboard molding; and (d) entrance trim.
Outside trim around Paladin window;
Interior trim – hall and living room, as
well as some minor trim work in the some-day-ti-really-will-be-a-library-room
I think this enough for right now, don’t you?
Last revised: 1 September
2003